top of page
GLC-Hwy92SoilCement-3.jpg
Soil Stabilization

An application necessary within our region, soil stabilization is now part of over 90% of all projects completed by GLC.  Utilizing the latest in stabilization equipment, GLC has this process down to a science, exhibiting results both in the field and within the quality control lab.  Combining the optimum mixture of cement, water, and soil, the finished product of “soil cement” has proven to be a highly effective base both for site and roadway projects.  With 3 dedicated and experienced crews with over 150 years of combined experience, GLC crews stabilize over 100 miles of roadway per year.

Past Jobs

SUGAR RIDGE

HWY 92 SOIL CEMENT

bottom of page